Solving interconnection challenges in Standalone BESS projects
As standalone BESS projects scale globally, interconnection remains a key challenge. From feasibility studies to cost estimation and stakeholder alignment, interconnection design for BESS is often fragmented and time-consuming. Join Soukayna (Product Manager) to learn how to streamline interconnection planning with best practices for transmission design, workflow alignment, and accurate cost estimation.


Soukayna Jermouni
Product Manager, Interconnection
Software developer and Energy engineer with a MSc in sustainable energy management. Joined RatedPower 4 years ago, originally as a customer success member, her understanding of the product’s users’ needs allowed her to become a project manager and developer; a position through which she developed both her understanding of the grid interconnection and managerial skills. Soukayna currently serves as a product manager of interconnection. She ensures that the interconnection features in the product correspond to the client’s needs and meet the engineering requirements.

Related Resources
- BESS
- Standalone BESS: future-proofing your PV projects with RatedPower
- Designing HV connections underground: Innovation beyond the overhead line
- Introducing 3D Energy simulations for precision solar yield estimates
- Recurrent Energy: Turning multi-tool workflows into a unified PV+BESS platform
- T&D Underground Line methodology
- Interconnection Facility Methodology
- Overhead Line Methodology
Start accelerating your PV plant design and engineering today
Our team of specialist is happy to answer your questions and show you RatedPower first-hand.
- RatedPower
- Resources
- Webinars
- Solving interconnection challenges in Standalone BESS projects