Repowering ageing PV plants: hybridising BESS onto a valuable connection
An existing grid connection is one of the most valuable things an ageing PV plant can hold, especially as interconnection queues stretch longer every year. In this session, Hassan Farhat (Lead Technical Advisor) shows how to hybridise an existing plant with BESS using CAD Import, Layout Editor and BESS Design, from importing the as-built layout to sizing the battery system around real site constraints and manufacturer clearances.


Hassan Farhat
Lead Technical Advisor
Hassan Farhat has a background in Energy Engineering and excelled in his Master of Science in Renewable Energy in Electrical Systems. More than three years ago, he joined the RatedPower technical team, where he works as a Solar Photovoltaic Engineer and Customer Success Manager at RatedPower.
Hassan has a thorough understanding of the industry and of RatedPower’s pvDesign, the digital solution to reduce LCOE and maximize productivity of utility-scale PV plants. He's passionate for renewable energies and their role within the global environmental transition.

Related Resources
- Exploring the RatedPower CAD import tool
- How to import an external DWG layout in Layout Editor (Article)
- Taking BESS dispatch beyond arbitrage
- [Success Story] Recurrent Energy: Turning multi-tool workflows into a unified PV+BESS platform
- J-POWER USA: A faster path to solar and BESS design with PRISM & RatedPower
Start accelerating your PV plant design and engineering today
Our team of specialist is happy to answer your questions and show you RatedPower first-hand.
- RatedPower
- Resources
- Webinars
- Repowering ageing PV plants: hybridising BESS onto a valuable connection