Croatia and Romania BESS economics: the early-mover case for standalone and co-located storage

Croatia has 11 MW of BESS. Romania has nearly 1 GW. Compare revenues, reserve saturation, and co-location economics, then watch our Balkans webinar.

Published by
Emil Trepin
Emil Trepin
Emil Trepin

Emil Trepin

Account Executive

Account Executive with a strong track record in SaaS sales and business development across multiple European markets. I specialize in driving revenue growth, building strategic relationships, and scaling market presence for innovative tech solutions in the energy sector.

Graduated in International Studies at the University of Trento with a thesis on foreign policy decision-making. Title: “Foreign Policy Decision-Making: A Poliheuristic Explanation of Donald Trump's Decisions in the Middle East”. During my Bachelor's degree, I studied for 5 months at the Kaunas University of Technology (Lithuania) as part of the Erasmus+ program.

Graduated in International Relations at the University of Bologna with a final dissertation on U.S. semiconductor policy in the Indo-Pacific region. In 2023, I attended Dickinson College (Pennsylvania, USA) during the spring semester as part of the UniBo Overseas program.

Updated 17 NOV, 26

Croatia and Romania offer two different early-mover cases for battery energy storage systems (BESS). Croatia has just 11 MW installed against a mapped potential of up to 1.7 GW. As of September 2026, Romania had 1,084.72 MW and 2,310 MWh of operational battery storage, according to figures reported from Transelectrica data. That is up from 989 MW and 1,975 MWh on 1 August, so reserve markets face saturation risk, and wholesale arbitrage, tolling, and co-location are likely to play a bigger role in project returns.

Much has already been reported about Bulgaria, the fastest-growing BESS market in the Balkans, where batteries now account for more than 16% of the electricity system, a higher share than anywhere else in the world. 

webinar balkans

Competition there has become so intense that arbitrage-led revenue models are getting harder to sustain. We covered Bulgaria’s RESTORE program, along with new market frameworks in Serbia and North Macedonia, in our post on BESS in the Balkans.

This post looks instead at two markets at an earlier stage: Croatia and Romania. Neither is close to Bulgaria’s level of penetration, but markets are seeing project activity that may create opportunities for developers, alongside permitting, grid-connection and revenue risks.

Croatia battery storage: an underbuilt market with room for first movers

Croatia has 11 MW of installed battery capacity, with a grid that increasingly needs storage: it recorded 257 hours of negative electricity prices in 2025, up from 196 hours in 2024. Most occur in spring and on sunny Sundays, when solar generation outpaces demand. In the face of this, Croatia’s amended Electricity Market Act was adopted in September 2026 and published as Narodne novine 114/2026. HERA has said that secondary rules and regulatory acts are still needed, with an improved framework for BESS projects expected from early 2027.

Mapped storage potential far exceeds installed capacity

A national study presented in March 2026 identified 22 priority locations for BESS with combined capacity of up to 1.7 GW, well above the 350 MW target in Croatia’s National Energy and Climate Plan. Against the 11 MW installed today, that is more than 150 times the current fleet.

Early projects blend public and institutional capital

The Šibenik project, a standalone merchant BESS of up to 60 MW paired with a virtual power plant, will be Croatia’s first large-scale battery storage asset. The EBRD’s project update describes up to €16.8 million in EBRD equity, an equivalent investment from Raiffeisen pension funds and a €16.5 million Modernisation Fund grant. Croatia’s Environmental Protection and Energy Efficiency Fund earlier reported a €19.8 million grant agreement and an approximate €60 million investment. Because the published figures differ, confirm the current financing structure with the project parties before stating a total.

For background on how Croatia is procuring new generation, see our overview of Croatia’s renewable auctions.

Romania BESS pipeline: strong revenues and rising competition

Farther east, Romania may be a preview of what could happen in Croatia. It had around 137 MW of installed BESS capacity at the start of 2025. By August 1, 2026, data from transmission system operator Transelectrica showed 989 MW and 1,975 MWh in operation, a more than sevenfold increase in about 19 months.

Permitting chokepoints are still keeping much of the headline pipeline on paper. Even so, enough developers have secured grid connection approvals and construction permits to turn a meaningful share of that pipeline into operating assets.

Croatia vs Romania at a glance

MetricCroatiaRomania
Installed BESS
11 MW (March 2026)
989 MW / 1,975 MWh (August 2026)
Mapped potential or pipeline
Up to 1.7 GW across 22 locations
As of 1 August 2026, 182 Romanian projects involving storage had connection contracts and building permits, with more than 12 GW of maximum approved export power across those projects. This figure is not battery capacity, and the projects remain subject to execution risk.
Market signal
257 negative-price hours in 2025
€120 to €180/kW/year modeled (2-hour, 2025 prices)
Support
EU Modernisation Fund grant (Šibenik)
€150 million standalone scheme for at least 2,174 MWh

What revenue have market models estimated for Romanian BESS?

An independent market assessment published by DNV in February 2026 found that Romania’s day-ahead market averaged €110/MWh in 2025, with a maximum daily price spread of €168/MWh. DNV modelled a 2-hour battery across wholesale and ancillary-service markets using historical Romanian market data. Its 2025 revenue index showed annualized modelled outcomes of about €120–€180/kW, depending on the price conditions modelled; these are not observed project earnings or a forecast for a specific asset.

More recent figures show how quickly those revenues move. Clean Horizon’s July 2026 index estimated annualized revenue of €404,000/MW for a 4-hour Romanian battery, following a reported month-on-month decline of 10–15%. This is a separate modelled index and should not be compared directly with DNV’s estimate.

The two figures are not directly comparable, because DNV’s covers a 2-hour battery over a full year. Both, however, show how sensitive Romanian revenues are to price spreads, and how arbitrage and ancillary income may compress as more batteries enter the market.

How quickly will Romania’s balancing market saturate?

 The ceiling is already within sight for ancillary services. According to DNV, typical hourly demand in Romania is 165 to 200 MW for automatic frequency restoration reserve (aFRR, up and down) and 80 to 130 MW for frequency containment reserve (FCR). These markets currently pay well, with FCR at around €70/MW per hour, but that requirement is small next to the multi-gigawatt pipeline of batteries planned for construction. Each battery added competes for the same limited reserve volumes, a pattern we have also examined in how saturated the UK BESS market is.

This volume constraint can lower modeled profitability, especially in FCR, where DNV notes market depth is most limited. Any credible revenue model also has to verify whether wholesale trading alone will generate enough returns to beat the project’s hurdle rate. On 2025 prices, DNV found that wholesale trading drove a significant share of modeled revenues, which suggests arbitrage can carry more of the revenue stack as reserve prices soften. Whether those spreads persist once more storage starts arbitraging them away is still an open question.

solar plant with little bess

R.Power’s 127 MW / 254 MWh standalone Scornicești project is in the final phase of construction, with grid connection expected in late 2026 or early 2027. Repono and Centalion (formerly Gunvor) are advancing a 202 MW / 404 MWh project in Argeș County under a cap-and-floor tolling structure. They are targeting a commercial operation date (COD) in Q2 2027, subject to financing and construction milestones. In August 2026, GEN-I Sonce began construction on its 55 MW / 220 MWh standalone Gheorgheni BESS.

These three projects add 384 MW / 878 MWh to a fleet that stood at 989 MW in August 2026. DNV estimates typical hourly demand of 165–200 MW for aFRR and 80–130 MW for FCR. These figures indicate that reserve markets are limited relative to Romania’s growing BESS fleet, especially for FCR. They are not a direct measure of the reserve volume available to every battery: eligibility, availability and product requirements also affect participation.

DNV flags this market saturation risk directly: growing deployment may pressure both reserve prices and achievable volumes.

Public support will add to that wave. The European Commission has approved a €150 million Romanian scheme, financed by the EU Modernisation Fund, to support at least 2,174 MWh of new standalone BESS through competitive tendering.

If standalone merchant revenues do become too weak, co-location may improve the odds for some projects.

Co-location offers a second route to market

If standalone merchant revenues do become too weak, co-location may improve the odds for some projects.

This dual-asset model is already taking root in Romania. Engie plans a 20 MW / 80 MWh BESS at its new 37.2 MWp solar plant in Prahova County, and Verbund is adding up to 50 MW / 100 MWh at its 226 MW Casimcea wind farm. 

Co-located BESS may share site infrastructure and a grid connection where the connection agreement, export and import limits, and electrical design allow. ENGIE has obtained a construction permit for a 20 MW / 80 MWh storage expansion at its Ariceștii Rahtivani solar plant. VERBUND operates a 226 MW wind farm at Casimcea and has publicly expressed interest in Romanian battery projects, but the 50 MW / 100 MWh project size and status should be confirmed with the company before publication. ENGIE project permit notice

The coupling choice matters here; see our comparison of AC vs DC-coupled BESS.

For co-located projects that will sell power to corporate buyers, see our guide to corporate power purchase agreements in Romania.

How do you compare standalone and co-located BESS in RatedPower?

RatedPower’s BESS design covers three entry points: hybridizing a plant you are designing, adding storage to an existing photovoltaic (PV) asset, and building standalone BESS on its own site. All three run through the same pass, from layout and sizing to electrical design, single-line diagrams, documents, and economics.

Arbitrage dispatch, battery degradation, and auxiliary consumption are modeled inside the simulation, and CAPEX and operating expenditure can come from built-in International Renewable Energy Agency (IRENA) cost templates or your own figures. Ancillary service and merchant cases take more setup, with the assumptions coming from your team rather than a default.

Frequently asked questions

How much battery storage does Croatia have?

Around 11 MW as of March 2026, according to Croatian Chamber of Economy estimates. A national study presented in March 2026 identified 22 priority locations where up to 1.7 GW of BESS could help address grid constraints. This is an indicative siting assessment, not a pipeline of permitted or investment-ready projects; the study also says storage cannot replace grid upgrades.

A national study has identified 22 priority locations with combined potential of up to 1.7 GW.

How much battery storage is operating in Romania?

Transelectrica data showed 989 MW and 1,975 MWh in operation on August 1, 2026, up from around 137 MW at the start of 2025.

What revenues can a BESS earn in Romania?

DNV modeled a 2-hour battery on 2025 prices at roughly €120/kW to €180/kW per year across wholesale and ancillary markets. Clean Horizon’s July 2026 index put 4-hour battery revenues at €404,000/MW/year, annualized.

Why consider co-located BESS in Romania?

A co-located battery can share the renewable plant’s substation and grid connection, and developers such as Engie and Verbund are already adding storage to existing solar and wind assets.

Get there before the crowd

Both Croatia and Romania still have room for developers who can test and refine viable configurations faster than the competition.

Watch our webinar, Financial viability of co-located PV + BESS projects: a Balkans case study, live on November 18, 2026, at 11:00 AM CET or on demand afterward. Emil Trepin and Matteo Menazzi from RatedPower are joined by Vladimir Antusevic, Senior Electrical Engineer at GMS Consult, to show how grid constraints, permitting, and land availability shape the business case.

To go deeper on the risks that can undermine storage returns, download the BESS Design Handbook: Tackling the hidden risks to storage projects, or request a demo to compare standalone and co-located configurations for your own site.

 

Share this

Related posts

Market analysis

Solar wheeling in South Africa: how it works and what it means for utility-scale IPPs

More on the blog

Market analysis

Designing solar plants for Latin American export limits

More on the blog

Market analysis

Solar plus storage in Italy: designing for a storage-led grid

More on the blog
solar panel farm bess